End fittings maintenance specification
- Aug 17, 2018 -

End fitting maintenance.png

For the transmission and distribution line fittings for power-off boarding and overhaul maintenance, it should generally be carried out simultaneously with the cleaning insulators. The general line should be carried out at least once every two years, and the important lines should be carried out at least once a year. The contaminated line sections can be appropriately selected according to their pollution procedures and properties. Increase the number of power-offs to check the cleaning.